The CE Code is a comprehensive document. Sometimes it can seem quite daunting to quickly find the information you need. This series of articles provides a guide to help users find their way through this critical document. This is not intended to replace the notes in Appendix B or the explanations of individual requirements contained in the CEC Handbook, but will hopefully provide some help in navigating the code.In this article: Section 12 — Wiring Methods.
It should be noted that while many other sections of the code are commonly used by designers, installers and regulators, Section 12 is mostly used byelectricians, who must clearly understand all aspects of wiring, and by electrical inspectors, who audit compliance of the wiring methods with the code requirements. Electrical inspection authorities must always be consulted on specific issues related to wiring methods.
Section 12 is a general section and applies to all wiring installations except for
• Class 2 circuits
• community antenna distribution and radio and television circuits
• opticalfibre cables
• communication circuit conductors
• conductors integral to factory-built equipment
That is, unless specified in the respective code sections covering those type of installations. We will discuss this later when dealing with Sections 16, 54, 56, and 60in future instalments.
The rules of this section may also be modified by the provisions of Section 32 — Fire alarm systems, Section 36 — High voltage installations or Section 45 — Emergency power supply, unit equipment exit signs and life safety systems.
Section 12 of the Code is divided into six parts:
• General Requirements
• Conductors
• Raceways
• Cablebus
• Manufactured wiring systems
• Installation of boxes, cabinets, outlets and terminal fittings
Generally the definitions in Section 0 apply throughout, but there are some special terminology definitions in the sub-section rules covering flat conductor cable type FCC.
In the General Requirements part, rules 12-010 to 12-020 apply specifically to locations where fire, mechanical, moisture or other environmental issues must be considered or locations where wiring may be prohibited, such as ducts and plenum chambers, underground installations, hoistways, lightning down conductors, entry of raceways and cables into buildings, and wiring under raised floors for data processing.
The Conductors part includes the rules applying to the installation of all types of conductors.It is divided into a general subdivision and individual subdivisions for each type of conductor.
In the General subdivision of Conductors,Rule 12-100 establishes that types of conductors must be chosen for their location with respect to moisture, corrosive action, temperature, degree of enclosure and mechanical protection as set out in Table 19. The Appendix B notes offer additional specifications on choosing the appropriate type of conductor.
Rules 12-102 to 12-120 provide general considerations for the installation of all conductors, such as:
• the treatment of insulated conductors
• flame test coverings
• multi- and single-conductor cables
• conductors in parallel
• radii of bends in conductors
• conductor joints and splices
• treatment of the ends of insulated conductors
• termination of conductors
• termination and splicing of aluminum conductors
• supporting of conductors
You will find, again, that extensive notes in Appendix B provide additional helpful information, including a diagram outlining configurations for installing parallel conductors.
The rest of the Conductor subdivision deals with the rules for specific types of conductors:
• open wiring Rules 12-200 to 12-224 apply to single conductors run as open wiring (colloquially referred to as "knob and tube wiring")
• exposed wiring on exteriors of buildings and between buildings on the same premises —Rules 12-302 to 12-318
• barebusbars and risers —Rules 12-400
• non-metallic-sheathed-cable: Rules 12-500 to 12-526 (NMSC)
• armoured cable —Rules 12-600 to 12-618
• mineral-insulated cable, aluminum-sheathed cable, and copper-sheathed cable —Rules 12-700 to 12-716
• flat conductor cable Type FCC —Rules 12-800 to 12-824
The third part, Raceways, includes the rules applying to the installation of all types of raceways.It is divided into a general subdivision and subdivisions for each type of raceway.
The General subdivision,Rules 12-902 to 12-944, governs the installation of all
• raceways and conductors run in raceways
• types of conductors and cable suitable for use in raceways as per Table 19
• conductors in raceways
• protection of conductors at the ends of raceways
• inserting conductors in raceways
• conductors, in conduit and tubing
• joints or splices within raceways
• stranding of conductors, electrical continuity of raceways
• mechanical continuity of raceways
• junction of open wiring and raceways
• entry of underground conduits into buildings
• raceways installed underground or where moisture may accumulate
• metal raceways in plaster
• protection for raceways installed in concrete, cinder concrete, and cinder fill
• raceways completely installed before conductors are installed
• capping of unused raceways
• maximum number of bends in raceways
• metal raceways embedded in slabs, pavement or roadbeds
The rest of the Raceways part documents the rules for specific types of raceways:
• rigid and flexible metal conduit:Rules 12-1000 to 12-1014
• rigid PVC conduit: Rules 12-1100 to 12-1124
• rigid types EB1 and DB2/ES2 PVC conduit: Rules 12-1150 to 12-1166
• rigid RTRC conduit: Rules 12-1200 to 12-1220
• liquid-tight flexible conduit: Rules 12-1300 to 12-1308
• electrical metallic tubing: Rules 12-1400 to 12-1414
• electrical non-metallic tubing: Rules 12-1500 to 12-1514
• surface raceways: Rules 12-1600 to 12-1614
• underfloor raceways: Rules 12-1700 to 12-1718
• cellular floors: Rules 12-1800 to 12-1820
• auxiliary gutters: Rules 12-1900 to 12-1904
• busways and splitters: Rules 12-2000 to 12-2020
• wireways: Rules 12-2100 to 12-2112
• cable trays: Rules 12-2200 to 12-2210
The fourth part, Cablebus, includes the rules applying to the installation of cablebus as a complete system.Rules 12-2252 to 12-2260 include:
• the use of Cablebus
• methods of installation
• connection to other wiring methods
• provisions for bonding
• ampacities of conductors in cablebus
The fifth part, Manufactured wiring systems, includes Rules 12-2500 and 12-2502 specifying the uses permitted, and Installation of Manufactured wiring systems
The sixth sub-section, Installations of boxes, cabinets, outlets, and terminals, includes Rules 12-3000 to 12-3036 that cover
• outlet boxes
• outlet box covers
• terminal fittings
• terminal fittings behind switchboards
• boxes in concrete construction
• outlet box supports, boxes, cabinets and fitting supports
• accessibility of junction boxes, outlet boxes, cabinets and fittings
• outlet boxes attached to existing plaster work
• outlet boxes, etc., in damp places
• entrance of conductors into boxes, cabinets and fittings
• unused openings in boxes, cabinets, and fittings
• extensions from existing outlets
• multi-outlet assemblies
• conductors in boxes, cabinets or fittings
• wiring space in enclosures
• maximum number of conductors in a box,
• pull box or junction box sizes
In the next installment we will be discussing Section 14 — Protection and control.
* The source for this series of articles is the Canadian Electrical Code, Part I, published by CSA
Read the rest of the instalments in the series:
Part 1: Guide to the CE Code, Part I – A Roadmap (Installment 1 in a Series)
Part 2: A Road Map to the CE Code, Part I – Installment 2
Part 3: Guide to the Canadian Electrical Code, Part I – Installment 3
Part 4: A Road Map to the CE Code, Part 1 – Installment 4
Part 5: Guide to the Canadian Electrical Code, Part I — Installment 5
Part 6: Guide to the Canadian Electrical Code, Part I — Installment 6
Part 7: Guide to the Canadian Electrical Code, Part I — Installment 7
Part 8: Guide to the Canadian Electrical Code, Part I — Installment 8
Part 9: Guide to the Canadian Electrical Code, Part I — Installment 9
Part 10: Guide to the Canadian Electrical Code, Part 1 - Installment 10
Part 11: Guide to the Canadian Electrical Code, Part 1 - Installment 11
William (Bill) Burr is the former Chair of the Canadian Advisory Council on Electrical Safety (CACES), former Director of Electrical and Elevator Safety for the Province of BC, and former Director of Electrical and Gas Standards Development and former Director of Conformity Assessment at CSA Group. Bill can be reached at Burr and Associates Consulting billburr@gmail.com.
Contractors! You Deserve Better.
OFFERING SYLVANIA AND LEDVANCE BRANDED LIGHTING PRODUCTS IN CANADA
Contractors! You Deserve Better | Win $2,000 Grand Prize from LEDVANCE, THE WORLD'S LEADING VERTICALLY INTEGRATED LIGHTING COMPANY
You deserve better and LEDVANCE wants to make sure you know it. Enter for a chance to be one of over 190 winners with the grand prize including $2000 and a SYLVANIA Work Light!
Read More
2021 Canadian Electrical Code Overview of Changes
CSA C22.1:21,Canadian Electrical Code, Part I contains many updates and changes that are potentially significant to electrical professionals. This online, self-guided course provides the key changes and impacts to the industry presented in an easy-to-follow format.
Designed for professionals with a good working knowledge of the Code and who solely need the key changes including general updates or those made for clarification, safety, and new products and systems. Key changes due to Rule relocation or deletion are also noted.
This course may help save valuable time to help keep electrical projects safe and in compliance. This training is developed with input from a broad cross-section of electrical industry experts and with cooperation from all provinces, territories and several key jurisdictions across Canada.
Read More
Liteline Acquires Contraste Lighting
Liteline are very excited to announce that Liteline Corporation has acquired Contraste Lighting.
Founded in 1989, Contraste has had many market leading innovative product developments. Over the years, Contraste has become a well-known and respected Canadian lighting fixture manufacturer across North America.
Liteline is proud to be able to continue to market this iconic Canadian Lighting brand. Contraste will be merged with Liteline and provide the opportunity to expand our product offering in Canada and the United States.
Learn more about Liteline
Changing Scene
OmniCable Joins ETIM North America
ETIM North America announced that OmniCable has joined the product classification standards organization. Headquartered in West Chester, PA, OmniCable has 24 locations throughout North America, and also owns Houston Wire & Cable (HWC). The company partners with many electrical manufacturers and only sells to distributors.
According to John Dean, Director of Marketing & E-Commerce, OmniCable/HWC, "The wire and cable industry is often called commodities, but there are very distinct features and attributes for the different products our manufacturers produce.
Read More
Atkore Inc. Announces Acquisition of United Poly Systems
Atkore Inc. announced that it has acquired United Poly Systems, a manufacturer of High Density Polyethylene (HDPE) pressure pipe and conduit, primarily serving telecom, water infrastructure, renewables, and energy markets.
"We are pleased to complete the acquisition of United Poly Systems, which strengthens Atkore's product portfolio, expands our manufacturing capacity and further enables us to meet HDPE customers' needs," stated John Pregenzer, President of Atkore's Electrical business. "HDPE pipe and conduit is a growing market that is expected to benefit from U.S. infrastructure legislation, and United Poly Systems is a great addition to Atkore. We welcome these employees and look forward to working together to continue to serve and support our customers."
Read More
Canadian Electrical Contractor Discussion Group: Can You Count the Deficiencies?
Have you ever been called to fix the work of a 'handyman'?
"Was supposedly done by a"certified ' electrician....told the homeowner that he got a $266 permit....no record at TSBC. Can you count the deficiencies?"
"There is a second panel change in the triplex also.......even more deficiencies. Think the guy was a glorified handyman. Ones not obvious: 240 BB heat hooked up 120....drier on 2p20....range on 2p50....water heater fed with 2c14 Bx on 2p15."
Go HERE to join the discussion
Grimard is more competitive and produces estimates 3X faster with Procore
When the pandemic lockdowns started in March of 2020, Grimard (an electrical contractor) had to decide whether to shut down its operations entirely or implement a new platform with people who were now freely available for work. Once they implemented Procore, they found a way to efficiently communicate with stakeholders and offer full transparency in terms of project costs and planning. It also allowed Grimard to utilize historical data to make project estimates more accurate. Grimard was able to streamline its bidding process, which made it more attractive to potential clients and helped the business grow.
Read More
RenuWell Pilot Projects Transform Inactive Wellsites to Generate Solar Energy
The RenuWell Project partners are excited to announce the groundbreaking of two pilot sites located near Taber, Alberta. These pilot sites are the first of their kind to repurpose inactive oil and gas infrastructure as a foundation for renewable energy development and job creation.
When operating, the solar projects will generate 2,030 MWh annually – enough electricity to power 280 average Alberta households or irrigate 11,700 acres of farmland for an average year. This is roughly equivalent to $200,000 in electricity sales per year with 1,100 tCO2e savings in GHG emissions. Over a 25-year lifespan, the projects will generate 50,750 MWh, with GHG emission savings of 28,420 tCO2e.
Read More
Product News
Ericson Reintroduces Industrial String Lights & SL Stringlight Series
Ericson announces upgraded versions of their extremely capable line of Industrial String Lights and SL, LED Stringlights. These new and updated products have several key features important when safe, code compliant lighting for industrial workspace is necessary.
Infinitely capable, these ruggedly built products have several industry leading & exclusive features including:
Industrial String Lights:
- A United States Navy Specification since before WWII, they're time and application tested...
Read More
Intermatic Introduces New Installer-Focused Pool and Spa Solutions
Intermatic Incorporated announced its new P40000 Series Load Centers, a set of next-generation panels for pool-only applications, as well as its new PE24GVA 24-Volt Valve Actuator, an easy-to-install valve actuator that allows for tool-free cam adjustments. Both solutions remove obstacles for pool service professionals while delivering lasting performance.
"Intermatic load centers and valve actuators have been the preferred choice of pool professionals for more than 30 years," says Brian Lamberty, product marketing manager at Intermatic. "The PE24GVA and P40000 Series build on that tradition, helping pool professionals streamline service calls while setting the standard for quality and performance."
Read More
Emerson Safety Device Prohibits Unauthorized Access to High-Voltage Electrical Connections
The Occupational Safety and Health Administration (OSHA) estimates 350 employees are killed annually in electrocution accidents, which roughly equals one fatality per day. In the face of these dangers, OSHA officials and industry safety consultants alike recommend eliminating potential hazards on work sites, rather than simply relying on contractors or employees to follow safety guidelines.
To help safeguard employees from electrocution, Emerson has launched its Appleton™ Powertite™ Lock Collar, a device that fastens over plug and connector connections and is secured with a padlock, preventing unauthorized personal from disconnecting the cable connection once in place.
Read More
Peers & Profiles
Copper $US Dollar price per pound
Source: https://www.electricalindustry.ca/latest-news/1750-guide-to-the-canadian-electrical-code-part-i-instalment-7